000 01308nam a2200205 a 4500
003 OSt
005 20160921091351.0
008 141127s1973 xxu||||g |||| 001 0 spa d
020 _a0070570450
041 0 _aspa
082 0 4 _221
_a658.5
_bS559 1973
100 1 _98608
_aShore, Barry
245 1 0 _aOperations management /
_cBarry Shore.
260 _aEstados Unidos :
_bMcGraw-Hill,
_c1973.
300 _axvi, 550 p. ;
_c25 cm.
500 _aIncluye apéndices: I. Linear programming and simulation -- II. Tables.
505 0 _aParte I. Design of the system: 1. Operational processes and their associated decisions -- 2. Capital investment decisions in process design -- 3. Replacement analysis -- 4. Process design: macro -- 5. Process design: micro -- 6. Human factors in job design -- 7. Project design -- 8. Facilities layout -- 9. Facilities location -- 10. Pollution control and its impact on the process --
505 0 _aParte II. Operation and control of the system: 11. Forecasting by exponential smoothing -- 12. Econometric foerecasting -- 13. Aggregate planning -- 14. The management and control of inventory system -- 15. Loading, sequencing, and control -- 16. Quality control -- 17. Management information system --
942 _2ddc
_cBK
_h658.5
_iS559 1973
999 _c58186
_d58186